Innovative Projects: Kiln Shell Replacement

Normal kiln high: 50 m.
Convention technic: Crane 500 ton can lift up kiln shell 62 ton. (at boom 14 m.)
Our technic: we concept use the lift jack, so can be up to 600 ton.

Short down time duration on kiln shell preparation

✓  Reduce time from 60 to 25 days

Move the old kiln shell to the lifting station

Remove old kiln shell from lifting station & replace with new shell and Lift up the new kiln shell

Take out the lifting unit from lifting station and move the new kiln shell to kiln line position